Monitoring
Environmental monitoring
Data loggers for the measurements specified for the installation. Battery power is used where mains is unavailable. A powered installation is used where a supply is present. Samples are stored as reported by the device and shown in engineering units. Each row is time-stamped in UTC when the server stores the post.
- Measurements specified for the installation
- Battery-powered and mains-powered installations
- Chart and download of the stored history